top of page
Featured Posts

News

Reagan Airport Gets New Boilers

THE CHALLENGE

Remove two aging and outdated boilers in Terminal A with the installation of four state-of-the-art condensing boilers requiring 16,000 million BTU/HR.

THE SOLUTION

The new boilers will contribute to Metropolitan Washington Airport Authorities goals of reduced emissions, reduced carbon foot print and decreased energy cost. Approximately 50% reduction in gas usage and saving of $30,000.00 per season. Boilers cost payback will be approximately in 10 years. Bill Oskouee, Lead mechanical design engineer and construction manager for Reagan Airport member of green team.

Recent Posts
Search By Tags
bottom of page